Fast Start-Up of Anaerobic Ammonium Oxidation Granular Reactor
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The start-up of Anammox process is very long due to the slow growth rate of the autotrophic anammox bacteria.The laboratory-scale study was carried out on the fast start-up of anaerobic ammonium oxidation in an up-flow anaerobic sludge bed with synthetic raw water(influent Total Nitrogen =200 mg/L,pH =7.5 ~7.8),and with anammox granule sludge stored at ambient temperature as the raw sludge feed.The results showed that quick start-up of anammox reactor was obtained after 68 day’s operation under the temperature of 33~35 ℃ by the decrease of hydraulic retention time.The ratio of NH4+-N removal,NO2--N removal and NO3--N production for the reactor was 1∶1.08∶0.26。 The reactor was operated stably and efficiently,and the NH4+-N and NO2--N removal was 90%,99% respectively under hydraulic retention time of 4 hours and organic loading rate of 1.2 kg/m3.d.During the operation,the color of the sludge was changed from black to reddish brown,and with excellent settling performance with settling velocity of between 20~78 m/h.

    Reference
    Related
    Cited by
Get Citation

LI Yuan, RUAN Wen-quan, REN Hong-yan. Fast Start-Up of Anaerobic Ammonium Oxidation Granular Reactor[J]. Journal of Food Science and Biotechnology,2013,32(4):388-392.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 17,2014
  • Published:
Article QR Code

Copy Right:Editorial Board of Journal of Food Science and Biotechnology

Address:No. 1800, Lihu Avenue, Wuxi 214122, Jiangsu Province,China  PostCode:214122

Phone:0510-85913526  E-mail:xbbjb@jiangnan.edu.cn

Supported by:Beijing E-Tiller Technology Development Co., Ltd.

WeChat

Mobile website